Overview:
A five-day course covering the essentials of well integrity and well integrity management throughout the life of the well, from design to abandonment.
Course Objectives.
This intensive five-day course is designed to provide participants with a thorough knowledge of well integrity, well-integrity management and risk assessment in producing assets. Those attending the course will:
- Have an improved understanding of well integrity management principles and risk management processes.
- Appreciate the importance of good well design and annulus construction – and understand the well as a pressure vessel
- Gain knowledge & understanding of international standards and recommended practices used to ensure well integrity
- Establish an increased awareness of well integrity issues and how they are controlled / managed
- Gain knowledge of how to maintain well integrity equipment for safe and effective operation
Course Content.
This course is structured around the widely used International Standards Organisation (ISO) standard 16530-Part 1. This document relates to Well Integrity and Well Integrity Management for the petroleum and natural gas industries. It is in widespread use across all the major operating companies and many local and national regulatory bodies.
Course outline:
Day 1.
- Defining well integrity
- A brief history of well integrity management
- Why well integrity matters (Macondo case study)
- Well integrity statistics and barrier failure examples.
- International Standards (for well integrity).
- Outline of the six well integrity life cycle phases (as defined in ISO 16530-1.
- Overview of ‘common elements to all life cycle phases’ as defined in ISO 16530-1.
- Well integrity definition.
- Well integrity policy
- Well integrity management systems.
- Risk assessments
- Organisational structures and tasks.
- Barriers and barrier verification.
Day 2
- Class exercise. Identification of barrier elements and primary and secondary barrier envelope.
- Continuation of overview of ‘common elements to all phases’ as defined in ISO 16530-1.
- Performance standards for equipment.
- Reporting and documentation.
- Management of change
- Continuous improvement
- Auditing
- Well integrity considerations during the basis of design and detailed design phases of the well life cycle.
- The importance of good design.
- Defining barrier philosophy and detailing barrier requirements.
- Casing and tubing design.
- Casing size
- Setting depth
- Cementing requirements
- Cement evaluation
- Tubing and casing stress analysis.
- Material selection (corrosion and corrosion mechanisms).
Day 3
- Flow assurance – the potential impact of scale, wax, hydrates and asphaltenes on well integrity.
- Sand production and sand mitigation.
- Completion equipment.
- Function
- Requirements
- Selection.
- Well integrity considerations during the well construction phase.
- Drilling and completion program preparation
- Planning considerations
- Barrier verification and barrier management
- Deliverables and well handover.
- Well integrity considerations during the operational phase.
- Barrier requirements
- Performance standards (allowable leak rate)
- Determining leak rate (with worked examples)
- Well monitoring and surveillance
- Types of surveillance
- Defining well operational limits
- Corrosion logging and monitoring.
- Annulus pressure management.
- Annulus pressure monitoring
- Types of annulus pressure.
- Annulus investigation
- Calculating Maximum Allowable Annulus Surface Pressure (MAASP)
- Annulus fluid expansion and pressure build up (AFE & PBU).
- Class exercise – MAASP calculation.
Day 4
- Well integrity considerations during the operational phase (continued).
- Well Maintenance
- Preventative and corrective
- Frequency?
- Identifying (and predicting) failure,
- Common failure modes)
- Potential leak paths
- Tree and wellhead maintenance – valve greasing and stinging.
- ESD system testing.
- Well failure model – action required in the event of WBE failure.
- Well Maintenance
- Well integrity considerations during the intervention phase (well interventions)
- Why interventions are performed.
- Restoring well integrity through mechanical interventions.
- Wireline
- Coiled tubing
- Rig (and HWO) assisted workovers.
- Barrier management during live well interventions.
Day 5
- Well integrity considerations during the intervention phase (continued).
- Rig supported well intervention – barrier repairs.
- Well Integrity During the Abandonment Phase
- Well restoration work.
- Abandonment barrier requirements
- Documentation.
Accompanying Material.
Participants will be provided with an electronic (soft) copy of instructors the slide pack in a PDF format.
Designed for.
Completion and drilling engineers. Well site supervisors (drilling, completion and interventions).